Calculate 4 Type-Recalculate days Calculation Changed
This process can be used before generating the calculation of integration to be recalculated the days when there was historical or schedules that affect the calculation of calculation. So, just be recalculated the day changed, preventing the other from being lost hit days.
There's a consistency in the calculation of integration that shows in the days when there were schedules or historical and recalculation of determination was not run.
Will be considered the following logs and schedules:
- 1-Exchange Programming Schedule
- 2 - Schedule Scaling
- 3-programming of Bridge
- 4-Compensation schedule
- 5-programming of Aut. of Overtime
- 6 - Exit Authorization Schedule
- 7-time Projection
- 8-history of Departures
- 9-history of Schedules
- 10-Branch history
- 11-Return of Apportionment
English
Español


