Note: This page was translated using automation resources with the purpose of providing content in your language more quickly. Consequently, it may have grammatical errors and similar situations. If the content is not useful in this state, in the page footer you can access the original material in Brazilian Portuguese and also give us opinions on this translation.
Tables / Resources / Automatic Processes / Import

Import Process

This process will automatically import the text file Input File or the table given in the field Import Table using the informed layout in the field Generator Model. This layout must be pre-prepared. For further information about the Import/Export models, consult documentation about this subject.

Like all other processes, the import process has its execution defined through the button Frequency.

Owner System

Select the acronym for the People Management module | HCM that will be the owner of the task. Thus, when the task is run, it will be destined to the correct system.

Location

Specify which processes will run on a specific server without these processes being run by the other servers that use this same database.

Note

The Location code is not mandatory for running the process.

Periodicity

In this field is displayed information referring to the periodicity of execution of this process. To change these settings, use the Periodicity button.

Only on weekdays

Indicate if the process should be performed also on Saturdays, Sundays and holidays. It is considered as being holidays all the days registered in the table of holidays.

Predecessor Process

This field allows to indicate that this process will only be run after the end of running the other process. For this, it is necessary to report the type of predecessor process (if it is a Report process, Calculation, etc.) and its code. The predecessor process is run 1 minute before the main process.

Process may Deactivate

If there is an error in the execution of the automatic process, inform whether the process should be deactivated or whether it should continue to be executed in the next periods.

Generates Log Message

Whether to generate a log message on the occurrence of an error in the execution of the automatic process.

Type of Log

Inform how the automatic process log should be generated:

  1. Generate log on Database: The log of the process running will be saved on the database, in the R300LOG table.
  2. Generate log in Text File: The log of the process running will be saved in a text file, in the directory of the input file.

Email of Responsible Person

If you want to send a log message when an error occurs in the execution of the automatic process, please inform the person responsible for the process.

Type of Import

Inform the source of the data to be imported: it can be a text file or a database table. According to the option chosen, the system enables/disables the corresponding fields.

Rename the File

Please tell us how the system should treat the previously generated file:

  1. Rename File. The previous file will be renamed. (Example: HR179142502 - HR - System Abbreviation, 17- Day, 9 - Month, 142502 Time in machine (hhmmss).
  2. Delete File. The previous file will be deleted and a new file will be generated;
  3. Keep File. The previous file will be overlapped by the new file.

Input File

Corresponds to the data file to be imported.

Important

The complete path and the full name must be reported for the file identification.

Import Table

Corresponds to the database table that will be imported. For further information, consult the file: Support Tools > Importer/Exporter of Text Files > General Information > Import of data via Database Table.

Generator Model

It corresponds to the model used to generate the report or to import the data. To select the file.

Language Code

Report the code of the language in which the automatic process will be run.

(missing or bad snippet)