Note: This page was translated using automation resources with the purpose of providing content in your language more quickly. Consequently, it may have grammatical errors and similar situations. If the content is not useful in this state, in the page footer you can access the original material in Brazilian Portuguese and also give us opinions on this translation.
Tables / Tables / Schedules / Schedules / Schedules / Information

Schedules information

Warning

This documentation has information that applies only to some modules. Contents that have the icon indicate each case, position the mouse over this icon and see the description of the modules.

Define the working schedule of workers, setting the shift, Saturday time, rotation, among other. For this, it is necessary to use the table of schedules, that must already be defined.

In addition, the hourly scale is defined according to the schedule it represents, facilitating the correct choice when informing the employee's register.

The scale determines the work routine of each employee, grouping the schedules in which the employee will work. All employees are attached to a scale, whether administrative, relay, caster, production or other.

Through the scales the system will automatically generate the hours to be paid to the employee, not requiring the user to inform each processing of the sheet.

Notes

Schedule
Code of each schedule, and can be up to 9999. This code will be informed in the information of each worker, as its working schedule.

Description
Brief description of the schedule that facilitates the handling of schedules, and can have up to 30 positions. Create meaningful names like "1st Shift", "Rotation 1", "General Shift", etc.

Legal aspect

Rest periods and Supplementary Overtime:

Workday Intra Rest Rest Between Supplementary Hours Desc. Weekly
Up to 4 hours - 11 hours Maximum 2 hours 24 consecutive hours
Up to 6 hours 15 minutes 11 hours Maximum 2 hours 24 hours
Up to 8 hours From 1 to 2 hours 11 hours Maximum 2 hours 24 hours

Weekly hours

Maximum of 44 hours, except under compensation of schedules type, laid down in agreement/collective bargaining, in which this maximum must be checked at each period of 1 year.

Hours Day

At maximum 10 hours for an eight-hour workday, and increase of two hours that must be paid as overtime or compensated.

WPRP

Weekly period rest paid, for 44 weekly hours is 7,20 or 7,33 centesimal hours.

Note

Periods of rest break will not be remunerated.

Information

The registration of the scales is necessary to cover the different shifts and schedules of the company.

Structure
Inform the structure code. It will determine which is the valid structure for each record of the window and to which company the register can be used.

Notes

Type of Schedule
Indicate the type of Schedule:

Note

For all types of scales, with the exception of the automatic generation scale and intermittent journey, it is always necessary to register the timetable for the previous month.


Auto Search Type
Inform the type of automatic search:

  1. For the Greatest Number of Hours Performed
  2. By the Highest Percentage of Hours Performed
  3. First Marking Made on the Day
  4. First Marking Performed on the Day Considering Tolerances

Class of Schedule
Inform the class of schedule as defined in Tables > Schedules > Class of Schedule.

Group of Schedule
Select the code that represents the shift to be associated with this scale. This information is used to define scope and breakdown of information in some reports.

WPRP Hours
Quantity of WPRP hours (weekly paid rest period). It corresponds to the division of monthly hours by 30 days.

Note

This field is influenced by the Centesimal Hours indication only in the Personnel management module. In the other modules they are presented always in sexagesimal format.

Hours Week
Report the quantity of weekly hours of work, of this schedule. The weekly hours will be used by the system to calculate the number of employee hours. The calculation of the month hours is done by multiplying the weekly hours by 5. This field is influenced by the Centesimal Hours indication only in the Personnel management module. In the other modules they are presented always in sexagesimal format.

Note

This field is influenced by the Centesimal Hours indication only in the Personnel management module. In the other modules they are presented always in sexagesimal format.

Hours Month
Total of monthly hours worked.

Note

This field is influenced by the Centesimal Hours indication only in the Personnel management module. In the other modules they are presented always in sexagesimal format.


Pay Proportional Extras Determine if there will be overtime calculation and payment for employees working on the holiday. Enabled only when using relay scale.

Type of Holiday

It defines which table of holidays will be used for workers of this schedule.

Notes
  • Generation Time Routines (RotGerHor);
  • Batteries Batteries of the Control of Point and Canteen in the Envelope;
  • Typing of Transportation Vouchers;
  • Calculation of end of notice;
  • Calculation of the date of payment on the individual holiday receipt (FRFERIND);
  • Calculation of the suggested date of payment on the collective holiday receipt (FR040PRG);
  • Calculation of suggestion date of payment in the collective vacation receipt (FR040PRC);

Table of Holidays
Inform the table of holidays for the schedule, if this schedule uses a specific table of holidays. If this schedule uses the table of holidays, this field must be blank.

Official Table of Holidays
Inform the table of holidays that contains only national holidays, for purposes of calculating the Transportation Vouchers.

Note
The routine will check if the day is an Official Holiday and if the worker is working in this day, that is, the day in question is not part of the table of holidays of the worker schedule, then, the vouchers informed in the VTR Schedule for the holiday must be paid.

Time Events in the Day Off

It indicates to the module how to allocate time events on days off, compensated, WPRP and holidays. It may be:

  1. Does not consider Schedule: It allocates time events from 00:00 AM to 11:59PM in the day;
  2. Allocate as Previous Schedule: It allocates the time events as the limit of the time of the day immediately preceding the day off;
  3. Allocate as Previous Schedule: It allocates the time events as the limit of the schedule of the day immediately after the day off.
Notes


Design Time Off Days
Inform how the calculation of overtime carried out in day off must be, indicating one of the options below in this field:

  1. Do not Design: the extra hours performed in the clearances will be calculated normally, without time projection;
  2. Design As the previous Time: the system designs, for calculation of overtime, the day before the day off. If the day before the break for a 9996 9997 9998, schedule, or 9999, the system back until the day in which the time is different from a day off. And this schedule will be projected in the day off for calculating overtime, respecting the tolerances as the registration of that schedule;
  3. Design As Time later: the system designs in the day off the schedule posterior to the days off. For that the tolerances of this schedule be considered in the calculation of overtime performed on day off.


Optional days
Inform the code of the Optional Days table.

Leave this field blank if the workers who will use this schedule do not have optional days.

In-between Workdays

It consists the minimum interval of 11 hours between a workday and another. The system will do a consistency in the registration of schedule, blocking or alerting the user when not respected the In-between Workday. Inform one of the options below:

Notes


Limit 1 Hours Bank
The goal is just to allow that a quantity of hours be reported, which may be used in the Integration rule - Generation Period, to control weekly hours of a certain worker. This limit can be consulted in the rule, through the LimBa1 variable.

Limit 2 Hour Bank
The goal is just to allow that a quantity of hours be reported, which may be used in the Integration rule - Generation Period, to control weekly hours of a certain worker. This limit can be consulted in the rule, through the LimBa2 variable.

Type eSocial Day

Select the code that represents the type of journey that makes up the scale.

The options "9" and "99" are identical, with the difference that the option "99 - Other types of day (scale, relay shifts, swaps, rotating schedules, etc.) - Do not lead to eSocial" will cause the Schedules group is not taken to the eSocial S-2200 and S-2206 layouts. Sending this information is optional.

Description eSocial Day

Provide a breakdown that describes the type of journey selected in Type eSocial Day. This description is free and can contain up to 100 characters.

The description is used to characterize any type of selected day, but is more focused on type "9 - Other types of day (scale, relay shift, swaps, rotating schedules, etc.)", due to the fact that this is more than the rest. You can enter the data that characterize this journey, for example: the schedules that make up the scale, the type of slack or the shift.

This information composes eSocial non-periodic S-2100, S-2200 and S-2206 layouts. This field is enabled for any type of day, but for eSocial it is only sent if the type of day is set to "9 - Other types of day (scale, turn, swaps, rotating schedules, etc.)" .

Groups

This item allows that the same schedule may be used to cover multiple rotation groups. In this case, it is important to set the start dates of validity for the groups. This folder is not available in all modules of the Human Capital Management | HCM module.

Class
Inform the group number.
The collective transfers of base schedules and Saturday's, as well as week hours, must be treated through this item. Only when the company does not use hourly scale.

Base Date
Inform the beginning date of each group, being that the group 1 is equal to the beginning of the schedule validity.

It is possible having at minimum one and at maximum eight groups; it occurs due to the rotation schedules, in which several workers uninterruptedly working, with some groups working and others on day off.

Schedules

Schedules

Inform all the schedules that will compose the schedule, completing a cycle. it can be informed up to 420 working times for permanent schedules and with automatic search.

If the Type of Schedule is "Automatic Search" (B), the treatment will be the same as the Permanent schedule, and it is still possible to use automatic search for up to five optional schedules in the days set by the user. These Optional Schedules will be reported in the Optional Schedules grid.

Note

When there is integration with the Time Management module, it is possible to register up to 30 optional schedules for each weekday.

The code of schedule 9997-Holiday, is never reported in the schedule registration, because the holidays are reported in Tables > Holidays.

When the Type of Schedule is "Automatic Generation" (G), this tab will be available only if the Treat Work field, from the Automatic tab is "S - Sequence of Schedules".

The double shift schedule is optional on this window.

Defined

These schedules are defined for each month. It is used mainly by guards or workers who do not have a cycle of work defined at each month. That is, at each month the worker has a schedule different from the previous month.

Period

Inform month and year for this "Defined" schedule. At each new period it is necessary to inform the schedules again.

Times of Defined Schedules

Unlike the permanent schedule, it must be informed at each month. It is used mainly by guards or workers who do not have a cycle of work defined. Its use needs a major care and attention, because at each month they must be informed about their schedules.

Schedule Date

Inform the date (day/month/year).

Schedule
Enter the schedule code for each day. To identify the WPRP, inform the code 9999, for "Saturday not worked" inform 9998 and for a "Special Day Off", inform 9996.

Automatic

When defining the Type of Schedule = G, the Automatic tab will be enabled, in which the Days off, Double Shift and Work Shift will be defined, which are used by the evaluation routine during calculation. A Work Time may be reported only if the timetables definition is not done by the Timetables tab.

Important

Treat Work

Set how the working times of the schedule must be treated.

Selecting the option "S - Sequence of Times" the system:

Day Off Time
Inform the code of the schedule that will be used by the routine of evaluation to evaluate the days off.

Double Shift Schedule
Inform the code of the schedule that will be used by the routine of evaluation to evaluate the days in which the worker is carrying out a double of shift.

Work Time
Inform the code of the schedule that will be used by the routine of evaluation to evaluate the work days.


Relay Button
It demonstrate the construction of the schedule day-by-day on the current period of the query, according to the beginning date, day od the week and schedules.

To view the times in their respective days click the button Relay, located in the left corner of the bottom of the screen. The system will display the schedules of the open-ended period, or if there is not any open-ended calculation, the system will show the schedules from the current month.

The Rotation enables that the same schedule may be used to cover many rotation groups. In this case, it is important to set the start dates of validity for the groups.

New Registration Button
The system starts the registration of a new schedule, by suggesting always the lowest available code and placing the focus in the field of schedule description.

Class: this field is included when there is more than one registered class.

(missing or bad snippet)