Disclaimer: This page was translated using automation resources in order to provide content in your language more quickly. As a result, it may contain grammatical errors and similar issues. If the content is not useful in this state, you can access the original content in Brazilian Portuguese at the bottom of the page, as well as provide feedback on this translation.

This manual is under construction. Therefore, some links may direct to pages with content under development.

AGR0084 - Period

The AGR0084 (Period) screen aims to group information and settings for a reference date so that they serve as the basis for Manual Work Log (Third-Party Services, Variable Compensation, and Scheduled Calculations) and Calculation Execution (Labor, Third-Party Services, Variable Compensation, and Scheduled Calculations) for a specific period in the Payments and Labor modules.

What can you do?

Register Period
  1. Access the menu Agricultural > Labor > Period (AGR0084);
  2. Click on Add ;
  3. To register, you must fill in the fields:
    • Production Unit : mandatory field. Retrieves the Unidade Produtora (ADM0012) records;
    • Project : mandatory field. Retrieves the Projeto (AGR0013) records;
    • Period : mandatory field. Retrieves the Safra (AGR0014) records;
    • Module : mandatory field. Represents which module the period information will be grouped for. This field provides the options Contract, CPG - Scheduled Calculations, Discounts, Labor, Invoice, Service Provision, and Third-Party Services;
    • Code : mandatory field. Represents the period record code;
    • Description : mandatory field. Represents the period record description;
    • Start Date : mandatory field. Represents the beginning of the registered period’s validity;
    • End Date : mandatory field. Represents the end of the registered period’s validity;
    • Reference Month : mandatory field. Based on the Start Date and End Date previously filled in, this field represents the reference month for executing Module Routines;
    • Active : identifies whether the period record can be used by Module Work Logs and Routines;
    • Cost Closing ;
    • Linked Periods : this field retrieves previously registered Period records that have accounting pending items (debits). When filling in this field, the accounting pending items from the selected period will be added to the current period (the field will only be available when the Module field is filled in with the Third-Party Services option);
    • Production Units for Third-Party Closing : (When executing the closing of this period, the companies below will be considered) - the field will only be available when the Module field is filled in with the Third-Party Services option and the ThirdPartyCorporateClosing | Third-Party Services – Corporate Closing parameter is disabled. Allows the system to consider more than one Production Unit in the query and data generation when executing module calculations, according to the link made in the field.
    • Filters : the filter group will only be available when the Module field is filled in with the CPG - Scheduled Calculations, Invoice, or Third-Party Services option. When filling in any field, during period calculations, only the records selected in the filter will be considered.
    • Exceptions : (The field will only be available when the Module field is filled in with the CPG - Scheduled Calculations, Invoice, or Third-Party Services option). When filling in any field, during period calculations, all records will be considered, except the selected ones.
  4. Click on Save .
Check the Parameters

Este artigo ajudou você?